ADCP-90-328 • Issue 2 • November 20051345101 Rev A Page 1© 2005, ADC Telecommunications, Inc.FPL Series Termination/Splice PanelUser Manual)INTRODUCTI
ADCP-90-328 • Issue 2 • November 2005Page 10© 2005, ADC Telecommunications, Inc.Figure 9 shows dimensions of the 24 position 3RU panel.Figure 9. Panel
ADCP-90-328 • Issue 2 • November 2005Page 11© 2005, ADC Telecommunications, Inc.Figure 10 shows dimensions of the 48/72/96 position panel.Figure 10. P
ADCP-90-328 • Issue 2 • November 2005Page 12© 2005, ADC Telecommunications, Inc.Figure 11 shows dimensions of the 144 position high density panelFigur
ADCP-90-328 • Issue 2 • November 2005Page 13© 2005, ADC Telecommunications, Inc.4 APPLICATIONThe FPL Series Termination/Splice Panel is designed for u
ADCP-90-328 • Issue 2 • November 2005Page 14© 2005, ADC Telecommunications, Inc.Figure 13. Cross-Connect Application5 INSTALLATIONInstallation will va
ADCP-90-328 • Issue 2 • November 2005Page 15© 2005, ADC Telecommunications, Inc.Figure 14. Example of Installing Adapters5.2 Installing PigtailsPigtai
ADCP-90-328 • Issue 2 • November 2005Page 16© 2005, ADC Telecommunications, Inc.Figure 15. Connector Numbers on Rear of 72 Position Bulkhead4. Route t
ADCP-90-328 • Issue 2 • November 2005Page 17© 2005, ADC Telecommunications, Inc.Figure 17. Pigtail Routing (24 Position 3RU Panel)Figure 18. Pigtail R
ADCP-90-328 • Issue 2 • November 2005Page 18© 2005, ADC Telecommunications, Inc.Figure 19. Pigtail Routing (144 Position High Density Panel Shown)5.3
ADCP-90-328 • Issue 2 • November 2005Page 19© 2005, ADC Telecommunications, Inc.The panel can be mounted in either a 19- or 23-inch EIA or WECO equipm
ADCP-90-328 • Issue 2 • November 2005Page 2© 2005, ADC Telecommunications, Inc.5.6 Installing FOT Patch Cords . . . . . . . . . . . . . . . . . . . .
ADCP-90-328 • Issue 2 • November 2005Page 20© 2005, ADC Telecommunications, Inc.Typically, only one cable is installed per panel. The cable clamp can
ADCP-90-328 • Issue 2 • November 2005Page 21© 2005, ADC Telecommunications, Inc.Figure 21. Cable Clamp Assembly (Top Entry)Figure 22. Cable Clamp Asse
ADCP-90-328 • Issue 2 • November 2005Page 22© 2005, ADC Telecommunications, Inc.5. A grounding lug is provided for grounding metallic sheaths and meta
ADCP-90-328 • Issue 2 • November 2005Page 23© 2005, ADC Telecommunications, Inc.In a typical installation, the methods and procedures that will be use
ADCP-90-328 • Issue 2 • November 2005Page 24© 2005, ADC Telecommunications, Inc.Figure 25. Right Cable Exit (Left as Viewed from Rear), 24/48/72/96 Po
ADCP-90-328 • Issue 2 • November 2005Page 25© 2005, ADC Telecommunications, Inc.Figure 27. Right Cable Exit (Left as Viewed from Rear), 144 Position P
ADCP-90-328 • Issue 2 • November 2005Page 26© 2005, ADC Telecommunications, Inc.Figure 28. Left Cable Exit (Right as Viewed from Rear),144 Position Pa
ADCP-90-328 • Issue 2 • November 2005Page 27© 2005, ADC Telecommunications, Inc.Figure 29. Routing Bundles into Splice Tray7. Mark each buffer tube an
ADCP-90-328 • Issue 2 • November 2005Page 28© 2005, ADC Telecommunications, Inc.Figure 30. Splice Tray Mounted in 24 Position FPL Panel18. Close and l
ADCP-90-328 • Issue 2 • November 2005Page 29© 2005, ADC Telecommunications, Inc.1. Connect the FOT equipment patch cord to the appropriate bulkhead ad
ADCP-90-328 • Issue 2 • November 2005Page 3© 2005, ADC Telecommunications, Inc.Figure 1 shows an example of a termination only panel, the 72 position
ADCP-90-328 • Issue 2 • November 2005Page 30© 2005, ADC Telecommunications, Inc.2. Route the patch cord from the FOT equipment to the rear side of the
ADCP-90-328 • Issue 2 • November 2005Page 31© 2005, ADC Telecommunications, Inc.1. Open the front cover of both the FOT equipment and OSP-dedicated FP
ADCP-90-328 • Issue 2 • November 2005Page 32© 2005, ADC Telecommunications, Inc.7 CUSTOMER INFORMATION AND ASSISTANCE© 2005, ADC Telecommunications, I
ADCP-90-328 • Issue 2 • November 2005Page 33© 2005, ADC Telecommunications, Inc.APPENDIX A: SHIELD CONNECTOR INSTALLATIONThis appendix provides the pr
ADCP-90-328 • Issue 2 • November 2005Page 34© 2005, ADC Telecommunications, Inc.Reproduced by permission of 3M Company, from 3M Instruction Bulletin,
ADCP-90-328 • Issue 2 • November 2005Page 4© 2005, ADC Telecommunications, Inc.• Cable Clamp Cover—protects cable at entry to the panel (not present o
ADCP-90-328 • Issue 2 • November 2005Page 5© 2005, ADC Telecommunications, Inc.Figure 3. 96 Position FPL Termination PanelFigure 4. 24 Position FPL Te
ADCP-90-328 • Issue 2 • November 2005Page 6© 2005, ADC Telecommunications, Inc.Figure 5. 12/24 Position FPL Termination Panel (1RU)Figure 6 shows a re
ADCP-90-328 • Issue 2 • November 2005Page 7© 2005, ADC Telecommunications, Inc.The front side of the 72 position termination and splice panel is ident
ADCP-90-328 • Issue 2 • November 2005Page 8© 2005, ADC Telecommunications, Inc.2 ACCESSORIESThe following accessory items may be ordered separately fo
ADCP-90-328 • Issue 2 • November 2005Page 9© 2005, ADC Telecommunications, Inc.Figure 8 shows dimensions for the 12/24 position 1RU panel.Figure 8. 12
Comentários a estes Manuais