ADC MM701G2 Manual do Utilizador Página 71

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 134
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 70
April 14, 2006 Chapter 7: Implementing a Point-to-Point LAN Extension
MM70xG2-UM-03 7-9
VERIFY CONNECTIVITY
After you have performed each of the previous configuration changes, verify back-to-back communication by
passing traffic over the WAN session. For example, set up a PC on the LAN-side of the Remote modem and another
PC on the LAN-side of the Central-Office modem. Then, transfer a file or ping between the two PCs. This generates
traffic and tests connectivity.
5Select Save Changes on the menu bar to access the Save Changes page.
Figure 7-12. Save Changes—CO LAN
6 Click Save to save the configuration to flash memory.
Step Action
1 On the front panel of one of the modems, check the status of the SYNC LED. If it is blinking, it is
attempting to establish communication with the other modem. If it is on solid green, it has already
synchronized its connection with the other modem. See “LED Status Indications” on page 1-5 for further
definitions of LEDs indications.
Step Action
Vista de página 70
1 2 ... 66 67 68 69 70 71 72 73 74 75 76 ... 133 134

Comentários a estes Manuais

Sem comentários