Table 10: AMI Standard (Non-HDSL) Spans - Provisioning
Required Tests General Information Parameters
DB Loss Test Unframed all ones pattern sent from
CO or remote test system. Measure-
ments at NI.
0 to -16.5 dB
Span Current
NOTE:
Current measurement test is not re-
quired when the span is fiber out to the
customer site and the smartjack is loc-
ated in the same bay or adjacent bay as
the mux and is locally powered by the
same power plant as the mux.
Use a volt meter that measures
voltage with at least 2 decimal point
accuracy. On a smartjack or NCTE,
measure the voltage between the
two test points labeled current or
voltage.
Voltage meaurement must be 0.6
VDC +/- 0.03 volts to equal 60ma.
Current measurement if taken in
milliamps must be 60 ma +/- 3ma.
QRSS
1 five minute test
test pattern 0 errors
3 in 24
1 two minute test
test pattern 0 errors
All Ones
1 two minute test
test pattern 0 errors
Bridged Tap
test is run on copper portion of spans only,
when errors are detected on other stress
patterns
21 test patterns (test sets are pro-
grammed to run these tests)
Only use this test on copper spans.
0 errors
AT&T Practice ATT-TP-000-000-006
Issue 1, 08/25/06
2006 AT&T Knowledge Ventures. All rights reserved