ADC HDSL4 Manual do Utilizador Página 24

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 38
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 23
Table 15: 24 Hour Test Parameters (Not a Standard Extended Test)
Facility Type Errored Seconds (ES) Al-
lowed
Severe Errored
Seconds (SES) Al-
lowed
Consecutive Severe
Errored Seconds (CSES)
Allowed
All Fiber
CO to NI
End to End
20
20
9
9
1
1
Fiber/(Copper<5 miles)
CO to NI
End to End
100
100
9
9
1
1
Fiber/(Copper>5 miles)
CO to NI
End to End
216
432
9
31
1
1
Reference: GR 64 Core Issue 1 December 1996
2.2 POPULATING OSSCN SCREEN IN WFA/C
The OSSCN screen will have different fields populated depending on the span type and line coding .
The OSSCN screen may be populated by both:
SSIM technician - SSIM technician will use Craft Access Remote Testing (CART)
SSTC technician - SSTC technician will use WFA/C to populate OSSCN screen.
The following fields must be populated for proper documentation during the circuit provisioning process. The
only 'required' fields that must be populated by the Special Services Test Center Technician are "ES" and
“Accepted By”. All other fields could by populated by the I & M technician through CART. The SSTC tester has
final responsibility upon circuit completion to verify information is populated on the OSSCN screen. The SSIM
technician must populate all fields except “ES” and “Accepted By” when CART is used to post CTR1
complete.
ES - Populate (A-Z), (Z-A), LPBK depending on type of test.
Installer - name of installer(s) at A and Z locations.
AT&T Practice ATT-TP-000-000-006
Issue 1, 08/25/06
2006 AT&T Knowledge Ventures. All rights reserved
22
Vista de página 23
1 2 ... 19 20 21 22 23 24 25 26 27 28 29 ... 37 38

Comentários a estes Manuais

Sem comentários